art camp count down – minus 4

Today we finished some walls of the left shower.

We added a support for the lost&found – Box and the box itself.

Nicole cleaned and protected the box.

Also she painted and protected the new signpost.

In the lower part of the art camp we prepared the table for serving the catering.

And we added mirrors to the sink area…

… on both sides.

Than we started to route the water to sinks and showers.

And prepared part of the first shower.