Today we have built the main wall for supporting the sinks. On top of the pallet we placed a casing. This wood frame will hold the concret platform.
We also added some wood an the side for more stability.
To connet the concrete platform with the wood wall we prepared some iron sticks.
Finaly we closed the middle wall with wood, also the lower part on the front- and backside.
Also we created the casing for the shower places.
A special challenge was the toilet place.
We created a box which is able to support the two barrels and the toilet seat.
Also we added the tube for the pie.
End of the day: we are nearly ready to mix the concrete for all platforms tomorrow.